ADU in Peoria, AZ

Peoria's ADU work sits north of the 101, where the lots were platted with room to spare.

— ADU in Peoria, AZ

What is different about Peoria

The northern subdivisions were laid out with side yards and rear space the production builder never used, and a casita is the obvious thing to put there. The architectural committee will have a view, so roof, tile and colour are matched to the house and taken to them alongside the City of Peoria submittal.

South of the 101 the lots are older and tighter and the answer is more often a conversion or an addition than a separate building. Either way the deciding factors are the same: setbacks, the capacity of the panel, and how far the sewer is from where a new bathroom wants to be.

Talk to us about ADU in Peoria

What that means on site

  • Room to build north of the 101
  • Committee and city in parallel
  • Conversion more likely in the south
(602) 399-6455 24/7 · Peoria, AZ

— ADU

How We Run ADU Work

The same approach everywhere we build. The full ADU page has the detail; this is the short version.

Experienced professionals with a practical build-first approach.

Customized solutions for your home, budget, and timeline.

Reliable scheduling and coordination from start to finish.

Attention to durability, appearance, and long-term value.

— Recent work

Jobs Behind the Peoria Crew

The same crew that answers a Peoria call ran these. Photographs are from Quest jobs across the service area, not staged, and not stock.

A sheathed exterior wall panel braced upright on a new slab
A framed opening and header on a Quest Construction build
The eave and roof edge detailed before the shingles go down

ADU in Peoria, done properly

Tell us what you need doing and we will come and look at it. 24/7.

Got a project in need of a builder?