Professional ADU Services
Offering exceptional ADU solutions, our team is committed to providing top-quality services to meet your needs in the Construction industry.
— How it runs
Our Unique ADU Service Process
Four stages, the same on every job, so you always know what happens next.
Initial Consultation & Custom Estimate
Our specialists meet to discuss your project details, analyze requirements, and create a tailored estimate. We pride ourselves on transparency, ensuring you'll know exactly what to expect from day one.
Strategic Planning & Scheduling
We devise a detailed plan tailored to your project's needs, scheduling the work around your timeline and coordinating resources for seamless execution.
Meticulous Preparation & Execution
Our team conducts thorough preparation and then executes the work with precision, focusing on durability, finish quality, and client expectations.
Final Quality Inspection & Client Walkthrough
We complete a quality inspection and guide you through a walkthrough to confirm your satisfaction.
— On the job
ADU Work We Have Photographed
Photographs from Quest jobs. Where a stage of this trade is not in the camera roll yet, the nearest one is, and the caption says what it shows.




ADU Services by Quest Construction
Accessory dwelling units can expand living options, create guest space, or increase property utility. We build ADUs with thoughtful design, durable materials, and careful project coordination.
Our team focuses on clear communication, careful planning, clean execution, and a final walkthrough that confirms the details are completed properly.
Why choose Quest Construction?
Experienced professionals with a practical build-first approach.
Customized solutions for your home, budget, and timeline.
Reliable scheduling and coordination from start to finish.
Attention to durability, appearance, and long-term value.
— FAQs
ADU Services FAQ
Addressing your ADU questions and concerns.
Can I build an ADU on my property in Arizona?
In most of the cities we serve, yes. Arizona House Bill 2720 was signed in May 2024 and took effect on 1 January 2025. It requires municipalities with 75,000 or more residents to allow at least one attached and one detached accessory dwelling unit on single-family residential lots. Phoenix, Mesa, Chandler, Glendale, Scottsdale, Gilbert, Tempe, Peoria, Surprise, Avondale, Goodyear, Buckeye, Queen Creek, Maricopa and San Tan Valley all clear that threshold. Smaller towns are not covered by the mandate and set their own rules, so we check the local ordinance before designing anything.
What is the difference between an ADU and a casita?
In Arizona the words are used loosely and often interchangeably. The practical distinction is that an ADU is a complete independent dwelling with its own kitchen, bathroom and entrance, and can normally be rented. A casita is often a guest suite without a full kitchen, which usually places it in a different permitting category. Which one you are actually building changes the permit, the utility connections and what you may legally do with it, so it is worth settling at the first conversation rather than at inspection.
Does an ADU have to match my house?
Under HB 2720 a city cannot impose development standards on an ADU that are more restrictive than those already applying to single-family homes in that zone, and height limits must match those for the main structure. Design and material matching requirements vary by jurisdiction, and an HOA can still enforce its own architectural review separately from the city. We submit both together rather than in sequence.
Do I need a separate utility connection for an ADU?
It depends on the design and the jurisdiction. Some ADUs run off the existing house services, others need their own meter, and on a property using septic rather than sewer the added bedrooms can push the system beyond its designed capacity. That last one is the constraint people find latest and dislike most, so we establish the septic and service position before drawings are worth paying for.
How long does an ADU take to build?
The build itself is the predictable part; the review is not. Plan review timelines differ substantially between a large city department and a small town or county office, and an HOA committee adds its own cycle on top. We give you a programme with the review window built into it rather than a construction duration that assumes paperwork takes no time.
— By city
ADU Where You Are
What changes about ADU city by city, written for each one.
Transform Your Space with Expert ADU
Contact Quest Construction today to elevate your property with expert craftsmanship and dependable service.

